Sector
Commercial
Year Completed
2023
Architect
Veretec
Structural Engineer
Robert Bird Group
Steelwork Contractor
William Hare
Main Contractor
Mace
Client
Landsec
Weight
3,200 Tonnes

Nova East

Being built to the east of the existing Nova scheme, the structure known as n2 will offer 14,800m2 of office space along with terraces on the upper levels.

The internal trusses begin at level one and extend up to second or third floor level, with the exception of trusses C and D that span between floors two and three. Typically, these trusses are up to 35m-long and 7.5m-high and were all delivered to site piece-small and assembled in-situ. The project is due to be completed mid-2023.